SITE DEVELOPMENT: Primary Power Installation - Hebron, NY

This 400'+ primary service installation weaved its way through a beautiful parcel in Hebron, NY.  Nearly half of the needed 3' deep trench required hammering to remove rock.  Two conduits were placed in the trench - one for the primary service and a second future for data that wasn't currently available, but may be offered in the years to come.

After learning about our customers discerning eye for detail and unbelievable house plans; which cantilever the home over an embankement, overlooking a waterfall - we offered to step up the utility installation and build an over the top pad for centrally locating the generator and necessary electrical enclosures.  They accepted the proposition and allowed us to create a unique, elegant and fitting solution for mounting the equipment... no wood allowed!

Services Provided:

Transport and Hauling
All materials were hauled on site due to limited access for heavy trucks.

Site Preparation
Go Pro installed conduit, a 400' primary service cable, transformer vault and generator pad with utility pedestal.

Design and Fabrication
The concrete pad was designed to accomodate a future whole house generator along with a stainless steel pedestal designed and fabricated to mount the pass-through meter panel, 200A transfer switch, a data junction box, as well as two receptacles - 15A and 30A RV.