This project was located in stunning Star Valley, Wyoming; nesstled in the Rockies on the boarder of Idaho. It required installation of a 1300' (1/4mi) long 4" irrigation header that is capable of servicing four adjacent properties with a total of 40 acres. Schedule 80 risers were located every 60' to allow tie-in and movement of surface irrigation pipe.
Services Provided:
Site Preparation
Go Pro completed a laser survey to determine the necessary drainage locations. This was followed by excavation for the header, trench prep and bedding, assembly of the pipe line and risers, then final bedding and backfill.
page 1 of 1 |